Question No : 1
You need to post any forward flushing issue transactions for a process Kanban job. To which status should you advance the job?
A. Planned
B. In Progress
C. Prepared
D. Completed
Answer: C
Question No : 2
At what level is the standard cost maintained for products that are included in a production flow?
A. item model group level
B. item group level
C. item number level
D. site level
Answer: D
Get Microsoft MB6-884 Real Exam Dumps - Microsoft MB6-884 Braindumps Real Exam Dumps
Question No : 3
An inventory controlled withdrawal Kanban is posted between two sites in the same legal entity.
Which cost is used to post transactions in the receiving organization?
A. last cost for the receiving organization
B. standard cost for the receiving organization
C. last cost for the shipping organization
D. standard cost for the shipping organization
Answer: B
Question No : 4
In Microsoft Dynamics AX 2012, when is the futures date on a planned Kanban used as the requirement date?
A. When the futures message Desired date is earlier than or the same as the action message To date.
B. When the futures message is deleted.
C. When the futures message To date is earlier than or the same as the action message To date.
D. Whenthe futures message is activated.
Answer: A
Best Microsoft MB6-884
Exam Study Guide - Microsoft MB6-884 Dumps PDF Real Exam Dumps
Question No : 5
When a manufacturing Kanban job is reported as complete, which of the following values may be specified? (Each correct answer presents a complete solution. Choose three.)
A. good quantity
B. first time through designation
C. product dimensions
D. error quantity
E. output warehouse/location
Answer: A,B,D